My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2511 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2511
>
2511 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:31:16 PM
Creation date
2/24/2017 2:31:02 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2511
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ '' ` <br /> �Q� O`�U(�a <br /> PROJECT INFORMATION <br /> OWNER APPLICANT: William and Susan Brodcway H (425)258-4468 <br /> 2511 Pine Street B(425)252�848 <br /> Everett,WA 98201 <br /> i <br /> CONTRACTOR: Ted Morrison Constnution #TEDMOC'013C4 i <br /> 5825 West Flawing Lake Road (360)56&1475 � <br /> Snohomish,WA 98209 <br /> LOCATION; 2511 Pine SVeet, Everett <br /> LEGAL DESCRIPTION: All that portion of the noAhwest quarter of the southeast quarter <br /> of Sedion 20,Township 29 North, Range 5 East W.M.described as follows: Beginning at <br /> the southwest comer of the northeast quaRer of the northwest quarter of the soutl�ast <br /> quaRer of said SecAion 20: Thence east 164 feet; thence north fifty feet fiur inches; <br /> thence west 164 feet;thence south fifty feet four inches to the poi�of beginning. Except <br /> Street Situate in Snohomish County Washington. <br /> TAX PARCEL NUMBER: 29052000403200 <br /> ZONING: Per City of Everett Zoning Code, R-2. <br /> USE: An owner oocupied Duplex Dw�lling <br /> LOT INFORMATION: Lot area is approximately 6240 sf (.14 acre), Existing fixed building <br /> coverage is 1938 sq ft or 31.04%of lot area; house is 1278.3 sq ft, <br /> garage is 659.4 sq ft(approx)for a total of 1938 sq R <br /> " No worlc or additions are proposed beyond e�sting building lines, <br /> except for replacement of roof eave structure and finishes <br /> ' Total coverage will remain the same. <br /> PROJECT DESCRIPTION: Re-roof with framing and upper lever building shell upgrades <br /> Phase I; Remove the existing roofing and framing and reh�ame the roof sVudure(refer to <br /> existing condition and projed construdion comment on this page)with the use of r'ie�w <br /> manufadured 2 x 4 wood trusses and OSB sheathing. The work will indude redraming <br /> the east end wall from the upper floor level to the new roof line to over frame the ebsting <br /> east sloping shed roof and roof dedc area, and removing and r�framing the dormer into a <br /> full"aoss gable" near the center of the buikling. The new roof line wiil look very similar to <br /> the west-end of the building and will alloNv additional window area in addition to eiimina6ng <br /> the leak prone existing east roof areas. The roof will be 30 year oomposition shingles and <br /> include new soffit, fascia, and gutters. New trim and siding(refer to the drawings)will be <br /> applied irom the upper floor level to the new eaves. <br /> Phase 2: Re-sheath and re-roof the existing detached garage to match the new house <br /> roof and siding. Phase 2 coukl be completed by late 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.