My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2726 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
2726
>
2726 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 2:42:12 PM
Creation date
2/24/2017 2:41:55 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2726
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM A10RIC ORDERS RSPORT <br /> Tctal Utility Maintenance Management System <br /> 06/15/1998 Page 1 <br /> -------------------------------------------------------------------------------- <br /> Date Range :O1/09/1989 - OS/31/1998 <br /> CM Work Order Range : 0610800810001 - UT2830-30-322Pattern :7101196730295 <br /> Item Range :<Blank> - WVL3694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> _________________________________________ <br /> --------------------------------------- <br /> CM WORK ORDER ID: 7101196730295 Title: REPAIR 2726 PINE ST <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WML2095T10 -- WATER MAIN LINE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 673 <br /> Date Completed: OS/14/1998 <br /> Overall Craft : <br /> Issued: OS/14/1998 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0 .00 Hr. - <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name . Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST TDE1 THOMPSON, DWAYNE E. 0 . 00 8. 00 164 . 96 <br /> SUP1 WMW WARD, MICHAEL W. 0 . 00 8 . 00 185 .28 <br /> Total Labor Cost : 350 .24 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> COUP44027347 COUPLING 6"DICI&AC X 6"DICI&AC O5/15/1998 2 95 .52 <br /> N/A TOP COARSE OS/15/1998 10 <br /> PIPE44055147 PIPE 6" TYTON JOINT DI O5/15/1998 2 14 . 06 <br /> Total Material Cost : 248 .38 <br /> . — 138.80 <br /> veh��ies: �09 ,� <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2048 89 GMC S15 8 . 00 33 . 60 <br /> VJ0026 ' 97 FORD 1 TON SVC TRUCK 8 . 00 47 .20 <br /> Total Vehicle Cost : 80 . 80 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> CRUSHED C. I . BELL <br /> Total cost for work order 7101196730295 : 679 .42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.