Laserfiche WebLink
'° .Bob Landles-Planning Dept. J .�� <br /> n,c.. <br /> Public Works Dept. � �'i.1'� �'.�t ?��� � <br /> p4C 7_24-79 <br /> c�i� _ _.c�cn [,tr.[i� su,ua�:c.iou <br /> --` ' S.F.P•A• Checklist Review ��125 <br /> PROPOSAL <br /> To construct JED Commercial Center south of Pacific, east of Pine. <br /> RECOMMENDAT►ONS <br /> [t is the recommendation of the Public Works Dept. that iss�ance of a Negative <br /> Declaration be subject to the following: <br /> � 1. Access, circulation and parking plans are to be submitted to the Public Works <br /> Department for review and approval. Plans sc vle�nud� aMost ntorthwestlerly <br /> right-of-way and show all required public imp <br /> driveway access is not acceptable. <br /> 2. City streets are to be kept clear of dirt and debris during construction. <br /> 3� Everegt shall be onnarterial stre ta unless ot erwiseeapproved by the Publ'ic <br /> Works Department. <br /> ` q, payment of street and alley vacation fees are required before permits are <br /> issued. <br /> 5. A site plan detailing improvements to right-of-way is required. Required right- <br /> v of-way improvements incl�de new curb, gutter, and 8 foot sidewalk on Pacific <br /> pvenue and new sidewalks on Pine Street. <br /> � A drainage plan with caiculations and an erosion control plan are required. <br /> Drainage calculations are to be submitted with the attached cover sheet. <br /> Amend Checklist as follows: <br /> li 13-b-change to yes <br /> Information for developer: <br /> `� 1. A fire hydrant is required within 200 feet of all buildings. <br /> 2. The existing small water services to the site shall be abandoned. <br /> `3, �n-site detention will not be required if storm water is conducted to the 42" <br /> interceptor on Pine or Pacific. ^ R � � (� M � I D <br /> uu ��, u u <br /> JUL '3� i9r� <br /> C1T1' OF Eu PL�TT. <br /> planning <br /> � .� <br />