Laserfiche WebLink
� <br /> � <br /> ' �l� <br /> ; <br /> October 1, 1980 <br /> Gene Noblitt I <br /> Cobra Construction Co. <br /> p, p, Box 1299 <br /> Everett, W A 98206 <br /> Dear Ivir. Noblitts <br /> This is to confirm the fact that the revised construction plans for proposed <br /> office complex at Paclflc and Plne, Everett, Washington, have been approved <br /> by the Englneering Department. <br /> ` The revision called for tlghtlining the storm sewer outfill from the subjeU <br /> property into an lnlet on the north slde of Pacific Street, instead of directly <br /> into a manhole In the intersectlon of Pacif[c and Pine, as originally planned. <br /> A stipulation of the approval, hoaever, is that the exlsting i.�let be rc�laced by <br /> an APWA type 6C catch basin with an cutlet trap• Detail of such a catch ; <br /> basin is provided In the City's Developers' Guide (Standard Plan No. C-14). , . + <br /> Slncerely, �, ' �'" � <br /> � -; . �1 <br /> t1UGN. u'ARREN, P.E. <br /> � Publ(c R`orks Director/City Englnecr <br /> I <br /> By: Clair Olivcrs, P.E. <br /> Senior Engineer <br /> f <br /> � Dh4:is <br /> �I ec: Dan Mathias <br /> � <br /> i <br /> I <br /> �,' <br /> , <br /> � <br />