My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3208 PINE ST 2018-01-02 MF Import
>
Address Records
>
PINE ST
>
3208
>
3208 PINE ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 12:46:33 PM
Creation date
2/24/2017 3:32:24 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3208
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />z PUBLIC WORKS DEPARTMENT <br />CHANGE ORDER <br />PROJECT TITLE: Demolition of five houses and accessory buildings located on <br />--ity Transit site between 32nd & 33rd Street and Pine and Cedar Street. <br />WORK ORDER NO.: PW2552 CHANGE ORDER NO. 2 <br />You are ordered to perform the following described work upon receipt of an <br />approved copy of this Change Order: <br />1. ASBESTOS: In the main building at 3205 Cedar Street Everett, Wa, which is <br />a single family residence, the Contractor shall remove all asbestos from <br />the floor located under the plywood flooring. <br />Payment shall be full compensation for furnishing all labor, materials and <br />equipment necessary to complete the work. All conditions of the contract shall <br />remain in full force. <br />Justification: <br />Puget Sound Air Pollution Control Agency Regulation III, Article 4, Asbestos <br />Control Standard. <br />CHANGE OF CONTRACT PRICE <br />Original Contract 3rice: $34,380.65 <br />Current Contract Price, as adjusted by previous change orders: <br />$36,614.18 <br />The Contrast Price due to this Change order will be increased by: <br />$ 647.40 <br />The new estimated Contract Price due to this Change Order will be: <br />$37,261.58 <br />CHANGE OF CONTRACT TIME <br />The <br />Contract <br />Time will be <br />increased <br />by - <br />0 - working <br />days. <br />The <br />date for <br />completio of <br />all w rk <br />,1 <br />under <br />n <br />the contract <br />August 28, <br />will be: <br />1992 <br />Requested by <br />Date: %/O - 2 <br />Reco Date: by <br />Date: -1 2- <br />ordered by <br />Date: <br />Accepted y <br />Date: <br />0 <br />���1 <br />J. Harper Contractor <br />