Laserfiche WebLink
CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />2 CHANGE ORDER <br />PROJECT TITLE: Demolition of five houses and accessory buildings located on <br />City Transit site between 32nd & 33rd Street and Pine and Cedar Street. <br />WORK ORDER NO.: PW2552 <br />CHANGE ORDER NO. 1 <br />You are ordered to perform the following described work upon receipt of an <br />approved copy of this Change Order: <br />1. ASBESTOS: In the main building at 3201 Cedar Street Everett, Wa, which is <br />a single family residence, the Contractor shall remove all lagging <br />materials containing asbestos from the pipes located under the building. <br />Payment shall be full compensation for furnishing all labor, materials and <br />equipment necessary to complete the work. All conditions of the contract shall <br />remain in full force. <br />Justification: <br />Puget Sound Air Pollution Control Agency Regulation III, Article 4, Asbestos <br />Control Standard. <br />CHANGE OF CONTRACT PRICE <br />)riginal Contract Price: $34,380.65 <br />Current Contract Price, as adjusted by previous change orders: <br />$34,380.65 <br />:he Contract Price due to this Change Order will be increased by: <br />$ 2,233.53 <br />-he new estimated Contract Price due to this Change Order will be: <br />$36,614.18 <br />RANGE OF CONTRACT TIME <br />he Contract Time will be increased by - 0 - working days. <br />:he date for completion f all wounder the contract will be: <br />August 28, 1992 <br />Requested by �li�-- Marian Dent <br />Date: 7• 7- 9.� / <br />Recommend4d by <br />)ate-' A <br />Drdeed by <br />)ate: <br />accepted <br />Date: <br />J. HQrper Contractor <br />7 AP ROVED AS TO FORM <br />City Attarney <br />