My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3320 PINE ST 2016-01-01 MF Import
>
Address Records
>
PINE ST
>
3320
>
3320 PINE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 4:06:14 PM
Creation date
2/24/2017 3:41:55 PM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3320
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Au�ust 27, 1999 <br />� � <br />r/6�L/C /�/�O/�Kri <br />Jim Stewart <br />American Sprinkler Corp. <br />2311 - 153" Ave., SE <br />Snohomish WA 98290 <br />Subject: Project: Crystalite Warehouse <br />Address: 3320 Pine Sueet <br />Plan Check No. K9908-006 <br />Deac Mr. Stewart: <br />In response to your application for a construction permit, your plans have been re- exami�d and <br />you are advised that the issuance of a permit is being withheld for the reasons listed on the attached. <br />These comments address building issues only. Additional revisions or additions may be required by <br />other departments (such as Utilities, Planning or Fire). All references refer to the 1994 Uniform <br />Building Code, as amended by the State of Washington and/or Washington State Energy Code 1994 <br />Edition, unless stated otherwise. <br />In order tor the processing of your application to cootinue, it will be necessary to provide t6e <br />Bwilding D[vision with two complete new sets of drawings reflectiog the rnrrections requested. <br />1'he pipe hangers are shown attached to the Z-purlin's flange, which resisa tensile forces. Tlx <br />manufacturer of the metal building should provide verification that the flange will support a point <br />load of 279 pounds without deformation. <br />• 250 A� per section 2-6.1.3 plus 29 pounds of water filled pipe - these loads should be verified. <br />Prepare a response letter showing where each item in this correction letter is addressed on the plan <br />set. <br />Upon submittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of su�cient detail and contain sufficient information to ensure that <br />the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />// i <br />To <br />Assceiate Engineer <br />CITY OF EVERETT• 3200 Cedar Sireet • Everett. WA 98201 •(425) 257-8800 • Fax (425) 257-8656 <br />
The URL can be used to link to this page
Your browser does not support the video tag.