Laserfiche WebLink
� " <br />� � <br />y <br />C M] N <br />F] ¢ M <br />'� �.] <br />� N N <br />��i� <br />o� <br />� � � <br />[E M <br />q �7 <br />e•� <br />r+ <br />N <br />tV y <br />� � � <br />� � <br />CLOSED Chi WORK ORDE>�.S REPORT <br />----____--_-UTILITIES Total Utility Maintenunce Management System <br />10/26/1992 Page 1 <br />Date Range :11/09/1900 - 10/26/1992 <br />CM L4ork Order Range :1001091070001 - 7401196770321Pattern :7401196750371 <br />Item Ranqe :<Blank> - S+)VL3195Q19 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM S�'ORK ORDER ID: 7401196750371 Title: CONVERT 925 PINE S f <br />Item ZD: WS1795G005 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Act.ivity 675 <br />Date Completed: 10/26/1992 <br />Overall Craft: <br />Issued: 10/19/1992 Issued b�: SKL Assigned to: WDT <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name Planned Hours Actual Hours Cost <br />----- ------ ------------------------------ ------------- ------------ --------- <br />UL ISiA LIBHING, MAURICE A. 0.00 3.00 34.62 <br />N'SW WDT WALDEN, DAROLD T. 0.00 3.00 48.72 <br />Materials: <br />ID <br />METE36089447 <br />VALV34008648 <br />VALV34097448 <br />Vehicles: <br />ID <br />V2146 <br />Description Date <br />------------------------------ -------- <br />METER 5/8" TRIDENT 10/19/1992 <br />VALVE METR 3/4" L/W FLA?D COP@ 10/20/1992 <br />VALVE ANGLE CHECK 3/4" @ 10/20/1992 <br />Number <br />Used <br />1 <br />1 <br />1 <br />Description Date Hours <br />------------------------------ -------- - <br />SVC TRUCK CHEV 87 10/19/1992 3.00 <br />Total cost for work order 7401196750371: <br />Cost <br />29.60 <br />10.95 <br />15.37 <br />/ �J <br />Cost <br />14.37 <br />153.63 <br />