Laserfiche WebLink
�3plication For <br />PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 259-8810 <br />TYPE OR PRINT ONLY <br />Owner Ma Plan Check No: C 52085 <br />Applicat.Date: 06//21 96 <br />Job Address: 1910 PINEHURST <br />Owner: COBLENTZ CHRIS <br />Tenant: <br />Ma Proposed Use: SINGLE FAMILY RESIDENCE <br />Desc. of Work: <br />BATHROOM ADDITION <br />Describe Proposed Work <br />PROJECT ADDRESS (if known) <br />Date <br />OFFICE SET JOB SET <br />APPROVED FOR PERMIT: DATE _/_/ <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following if applicable: <br />Public Works Pernil p <br />Building Permit If_ <br />Public Works Fee $ _ <br />SEPA <br />Phone <br />Phone <br />'Property Lines 'Outline and dimensions of all existing and proposed structures on the lot •Existing and proposed utilities <br />`Centerline of street "Indicate North 'Show any proposed grading changes 'Show measurements <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. <br />No rubI,c Wb(*,s gymi� CToi tj <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />&/z4/ace & <br />ca <br />O <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of <br />the improvement or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />