My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1716 PUGET DR 2016-01-01 MF Import
>
Address Records
>
PUGET DR
>
1716
>
1716 PUGET DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 5:21:31 PM
Creation date
2/24/2017 4:19:49 PM
Metadata
Fields
Template:
Address Document
Street Name
PUGET DR
Street Number
1716
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Wor':s approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per Ciry Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />� Rookop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width �, Depth a' , Length f9'. <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the stree4 paving. <br />14. Contact the Water District for connecting provisions ror this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then graviiy flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />�. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />19. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />� Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />� Install erosion control measures per City of Everett Standards for small parcels. <br />PWComments � <br />� <br />� 7 �(o Pc��i�--� 1�-�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.