Laserfiche WebLink
� CLOSED C2I WOR1C ORDERS REPORT <br />Total Utility Maintenance Management System <br />07/15/1997 Page 1 <br />e=�eeeev=ec=easeev=�=ece=e==e=eeveveoe==c=e'=vee=�e'==e--' v==�ccee�e===ov=vecce- <br />Date Range :12/03/1900 - 07/01/1997 <br />CM Work Order Range :1001091070001 - PW2548-19- Pattern :7101196751083 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_________��_____________________________________________________________________ <br />CM WORK GRDER ID: 7101196751083 Title: CONVERT 1726 PUGET DR <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0785Z019 -- WATER SERVICE <br />Location ID: -- <br />Proqram 710 Function 119 Activity 675 <br />Data Completed: 06/09/1997 <br />Overall Craft: <br />Issued: 05/21/1997 <br />out of Service? NO <br />Meter Readiny: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />UL CSG <br />WST WDT <br />Materiale: <br />ID <br />ADAP34000447 <br />ADAP34000547 <br />ADAP34000647 <br />ADAP34150747 <br />BOX000065547 <br />ELL034101447 <br />METE36089447 <br />PIPE34060647 <br />VALV34008348 <br />vehicles: <br />ID <br />V2117 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />CAVANAH, SHANE G. <br />WALDEN, DAROLD T. <br />Description <br />ADAPTER 3/4" IPS UNION INSTA @ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />ADAPTER 3/4" MIP X 1" IPS RI @ <br />BOX METER CONC W/STEEL LID <br />ELL 3/4° 90 DEG SRASS � <br />METER 5/S" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" IACK WING IP@ <br />Description <br />---------------------- <br />91 CHEV 1-TON HYD UNIT <br />Work Description: <br />----------------- <br />NOW COMMERICAL <br />METER #41908445 <br />Planned Hrs <br />0.00 <br />0.00 <br />Actual Hrs Cost <br />---------- ---------- <br />3.00 40.44 <br />3.00 63.69 <br />Total Labor Cost: <br />Date # Used <br />06/09/1997 1 <br />06/09/1997 3 <br />06/09/1997 2 <br />06/09/1997 1 <br />06/09/1997 1 <br />06/09/1997 1 <br />06/09/1997 1 <br />06/09/1997 3 <br />06/09/1997 2 <br />Total Material Cost: <br />Hours <br />���I�] <br />Total Vehicle Cost: <br />Cost <br />15.90 <br />15.90 <br />104.13 <br />Cost <br />9. ].1 <br />25.14 <br />15.08 <br />4.25 <br />52.32 <br />1.36 <br />30.67 <br />0.69 <br />17.24 <br />155.86 <br />-------------------------- <br />