Laserfiche WebLink
/ <br />PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 9SM1 <br />(425�J57 POSTING NOV 2 120 <br />Date <br />r`-Iblic Works Permit JI <br />Building Permit x <br />Planning Reference 0 <br />Public Works Fee $ <br />Guarantee $ <br />11/22/1999 <br />Pfi19911-030 <br />$ 20.00 <br />OWNER NAME <br />3 JOHNSON CONST INC <br />APPLICANT NAME <br />AND ADDRESS: <br />1801 GROVE ST UNIT B <br />AND ADDRESS: <br />MARYSVILLE WA 9827 <br />PHONE: <br />(360) 659-1579 <br />PHONE: <br />TAX PARCEL I.D. x <br />PROJECT ADDRESS: 1801 Puget Drive <br />DESCRIPTION OF <br />NEW HOUSE <br />PROPOSED WORK: <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.BOG-424-5555 <br />Approved tar Construction Date ' <br />FINAL INSPECTION <br />Approved as Constructed Date <br />11-30-99 <br />BUILD <br />SRCHG <br />PLUME <br />MECH <br />DRIVE <br />0 <br />SE'4ER <br />4;i;-. <br />991001? <br />8^c5 <br />77.,'" <br />60.00 <br />20.00 <br />oglrr,"- <br />ACKNOWLEDGEMENT OF CONDITIONS <br />4 <br />co <br />O <br />The undersigned owner/applicant hereby agrees to fold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove Santa upon notice from the City and to replace public <br />property ged thereby <br />ro of AppFtenl Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 190 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />