Laserfiche WebLink
} INSPECTION REPORT <br />PL <br />Address <br />Contractor -- <br />Owner �L <br />/ Date <br />APPPOVAL U PARTIAL APPROVAL <br />t{ VIOLATION 0 CORRECTION REQUESTED <br />J VI <br />f' Corrections listed below MUST BE MADE before <br />work <br />can be approved. <br />f U Please contact inspector and arrange appointment. <br />O Was not able to perform inspection. <br />! U CALL (425) 2574810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />P OF INSPECTION REOUESTE <br />❑ Temp <br />U mingg <br />Nailing <br />U Gas Piping <br />U Consu ation <br />U Foohrywall, <br />❑ Fou <br />a <br />ion <br />U Shear Nailing <br />UGtyle <br />U Ductwork <br />U Wood Stove <br />UO Rough-�in <br />U Final <br />U Insulation <br />U Masonry <br />U Service <br />�/q� p�y�y/� /Uy�Other <br />BLDG: Pmt. No. _4?W_ , MECH: Pmt. No. <br />U ELEC: Pmt. No. U PLBG: Pmt. No. <br />