My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3703 RAILWAY AVE 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3703
>
3703 RAILWAY AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 7:45:11 AM
Creation date
2/24/2017 4:25:18 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3703
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />�iversilied <br />July I l, 1995 <br />f i le No.: 0001-02-01 <br />Mr. Dan M:�ihias, P.G. <br />Associate Engineer � <br />City of Everett Public Works <br />Dear.Mr. Mathias: <br />j�GJ �15�,� 5 S <br />services <br />� <br />3304 252nd St. NE <br />Arlington, Washington 98223 <br />Telephone: (360) 435-0449 <br />Fax: (360) 435-9008 <br />Scotf Paper Log Yard Pump Station - <br />Sim•m Waler Calculations <br />As ,you will recall ihe City of Cveretl approved a peak discharge rate of 18.6-cfs/8350-gpm <br />for a pump station to discharge storm water from the. Scott Paper Company's Riverside Log <br />Yard into the 72" CSO. The pump station you are currently reviewing h:�s been designed and <br />will be constructed with the capaciry to operate at the a��aroved maximum discharge rate of <br />8350-gpm. However the pump station will initially operate at a maximum discharge rate of <br />4140-gpm which will handle the storm water runoff from ihe approaimately 50-acres of ihe <br />log yard which currently drain to ihe ditch/reservoir - this includes the chip milL At T future-.. <br />time when the remaining log yard stonn water system is rerouted to the west drainage ditch <br />two additional pumps will be added ro the pump station which will increase the pump station <br />discharge clpacity to a total of 8280-gpm. <br />Attached you will find ihe storm water calcula;ions used to design the pump station capacity. <br />If you have any question please feel free to call me at (360) 435-0449. <br />Div tied Gngineering Services, <br />���� �� <br />� <br />David L. Parshall, P.E. <br />Principal <br />
The URL can be used to link to this page
Your browser does not support the video tag.