My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815 RAILWAY AVE 2016-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3815
>
3815 RAILWAY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 11:22:35 PM
Creation date
2/24/2017 4:25:55 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70: City of EvereEt <br />g5Z3?_d <br />, <br />Fr•om: Lennon Ce•ane and Equipment Company Incorporated <br />This is the fir•st Building Froposal that I've work:ed on� $o I <br />hope that everything you need•is here. <br />I've spok:e with Steve E�galsbee af the Flan�ing and Community <br />Development Depae•tment and he pointed.out a few thi�gs that I need <br />to make note of. ' • <br />As you will see on the map on page FIVe-. ahout halt !he lot (to <br />the r•ight of the dotted line) is in the tne line of ihe Hu�dred Year• <br />Flood. To avoid this u�wanted disaster• we would need to tie down <br />a�d sk:irt the trailer to the left nf this dotted'line. As you'li, <br />find on page four•, the pr•oposed site is taT• to the left of thai <br />1ine. <br />Secondly, the pr•oper•ty r•ight now is almost all flat gravel. We <br />don't feel that it is nessaf•y to have paved par•king at the site. If <br />ther•e is a foe•mal pr•ocess thai needs to 6e do�e to•waive the paved <br />park:ing than I will do as required. • <br />.i <br />I've also spoken with Faul Mc4'.ee in the Fublic WorM:s Department <br />r•ega�•di�g botfi water• hook:-up and the possibility af an above pr•ound <br />septic tank. Flease see page -/tiree. Seeing that we can't puL a <br />se�itic Cank or even an above ground holding .Ca�k in� our options <br />beCome limited. With. this in mind we'�e opted to do a wa�tee• hook up <br />out side for• a hose and go wiih the For•ta-Fotty idea seeing that we <br />can use Canyon Lumbee•s facilities if we need them. <br />As you will see an my map on page �o:� we are planning to r•un <br />power• fe•om the e:<isting building to the tr•ailer•. We ar•e most likQly <br />•going to have Filchuck Electr•ic do the power• ceeing that they did <br />the powee• install,on the e:<isting building. We are planning to dig <br />a two-foot ditch from the cor•ner• of the buildi�g (appr•ou. 3S0 feet) <br />and lay the copper• wie•e accordingly. Electe•ical pee•mits will be <br />appliad for• Lhr•ough the electr•ical contr•actor•. <br />� We have selected Seven Lak:es Construction to do the blocking� <br />tie dow� and skir•ting of the tra.iler. They will be doing it per• <br />code ior both the manufactue•,er• <see manufactur•ers pack.�t) ard the <br />county. You will also find the building plans foe• the staie•s and <br />wheel chair• r•amp on page seven. They camQ through o� the ta:< so <br />they ae•en'E bhe hest, yet they'll give the basic idea. <br />At the cur•r•ent time we ar•e paying dou6le rent. O�e for• the <br />pe•oper•ty at 3615 R�ilway Ave. and the other at Shaffer• Crane.. With <br />this in mind we ar•e wanting to get everything appr•oved a�d up and <br />gaing as soon as possihle so we.can move out of.Shafter• Ce•anQ. <br />I u�dee•stand that getting a water hook:-up is a over• the counter• <br />process a�d I plan o� doi�g that early �s:<t week:. , <br />Flease feel fe•ee to give me a call if you have any question� or <br />concerns. � <br />Si�cerely� Scott Le�non <br />_���;, <br />� -�-"T' ==��_�= <br />
The URL can be used to link to this page
Your browser does not support the video tag.