My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4015 RAILWAY AVE 2016-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
4015
>
4015 RAILWAY AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 2:36:24 AM
Creation date
2/24/2017 4:30:00 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
4015
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%NI�O{2MA7'IiON I'OR DIiVFI,tiP�;Ft: <br />The following informatlon Is provided for the developer's beneflt. Thesc are not SEPA conditions but <br />are associated with otl�er laws or requirements. All requirements are prellminary in nature, and are <br />based upon the p�ellminary slte plan and flie ordinances In efFect at time oP submittal for SEPA revlew. <br />The proposal must comply with ail ordlnances in effect at the time a complete building permlt <br />appllcatlon is flled, Including those not specifically seC forth herehi. Contacl the Planning DeparlmenC <br />For Informatlon regarding appeais processes for Clie requlrements Iisted In tlils document. <br />1. A Public Worlcs Permlt Is required for this project. Detailed drawings In accordance wlth Clty Design <br />and Constructlon Standards shall be submltled to the Public Works Deparfinent, showing flll <br />placement, storm dralnage, and temporary constructlon erosion conlroi. The pian set shall also <br />Include a defailed shoreline restoration planting plan. Publlc Worlcs and Planning approvals are <br />reqWre prior Co any pern,!1, being Issued, <br />z. Demolitlon permlt(s) are required prlor Co removing any bulldings. <br />3. Eroslon controi measures shall be provided as proposed. '1'emporary eroslon control measures must <br />be operationai prlor to commencement of any clearing or earthwork. <br />4. Clty streets and aileys are to be Icept clear of dirt and clebrls at all tlmes during constructlon. Dust <br />suppresslon and street cleaning must occur as direcled by the Publlc Works Inspector. <br />
The URL can be used to link to this page
Your browser does not support the video tag.