Laserfiche WebLink
Everett Flood Plain Fill Projects as of 12/15/10 <br />How high should fill be above 100-yv. flood? 0.5 foot(Except for boneyard.) <br /># 1,2,3,4, & 5 will need Letter of Map Revision (LOMR) by Sept. 1, 2011 <br />1. KC Site <br />2. Simpson Pad <br />3. Riverfront <br />Park <br />4. Eclipse Mill Rd <br />Riverpoint <br />Lot 1,2,4 & <br />Parcel O,V <br />Riverfront <br />Riverfront <br />N.O. 36`� St <br />E.O. Eclipse Mill Rd <br />Riverfront <br />Between 36`h & <br />Pacific <br />44 Acres BA — Done <br />Tim Marks 1.5'; 63,000 CY Dred9e Spoils Shoreline Permit — <br />4.0':167,000 CY Done <br />Oliver <br />McMillan <br />(Dave D.) <br />Tim Marks <br />(W/�aY <br />Magill) <br />Tim Marks <br />5. WPCF— South Smith Island Tim Marks <br />Digester Pad <br />6. Dredge Spoil 1.KC Site-Parcel O Chris <br />Deposit 2.Port-Riverside Chesson <br />5�/nCommon/Cleriwl/11M.M/Floodplain Fdl vro�e•cts.dnr <br />TBD <br />They have dirt <br />3 Acres <br />10,000 +/-CY <br />Donc <br />2 Acres <br />67,000 CY <br />»> <br />Surcharge <br />#3? <br />Surcharge <br />ti 3 <br />»� <br />Riverfront EIS — Done <br />SEPA Review — Done <br />Need Greding Permit <br />Update Shoreline <br />Permit Has been <br />Submitted; <br />Need Grading Permit <br />BA — Done <br />In for Permitting <br />N/A River bottom Port getting permits <br />No <br />wetlands.Work <br />with Paul <br />Crane <br />No wetlands <br />No wetlands <br />Expect permit <br />3/15/11 <br />Has been filled <br />Filling <br />wetlands <br />I Ask Port to <br />increase <br />dredge <br />_ volume <br />