My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1123 RAINIER AVE 2018-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1123
>
1123 RAINIER AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 11:11:04 AM
Creation date
2/24/2017 4:35:35 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1123
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM DRqINAGE ltGPORT <br />THE MEADOWS U <br />Overview: <br />A 51 unit, 4-story apartment complea wir1� associated pazking is proposeJ for a 1.24 <br />acre parcel located on Rainier Avenue between Poplar and 12�' Street and approximately 1 <br />mile south of the .4merican Legion Memorial Park & Golf Course. More generally tl�e <br />site is located with the SE �/. of the NW Y. of Section 17, 'fownship 27N, and Range SE of <br />the Willamette Meridian. <br />Existine Conditions <br />The site is undeveloped with urban unmaintained grass cover. It is located within the <br />36'" Street Combined Drainage Basin. A portion of an existing building straddles the <br />south propeny line at the SE corner of the site. The site slopes 1-2 % downward frum <br />east t� west. Current drainage from the site flows westward to Rainier Avenue where it <br />enters the combine sewedstorm drain system. <br />Dev I e i ndi i ns <br />Construction of the apartment complex and the associated parking will create 0.85 <br />acres of impervious azea. Runofffrom these impervious surfaces will be directed to a 48" <br />CMP detention pipe. In accordance with the City of Everett Standards, the detention pipe <br />is desibned to detain the 10 year storm and release at the pre-developed ]0 yeaz rate. The <br />discharge flows out of the pipe will be controlled by a flow restructure / oil pollution <br />control device (FROP). The chart below list relevant discharge rates. <br />___ _ _._._._ ___ <br />DESIGN PRE-DEV Qp <br />STORI�t <br />10-YEAIt, 24 Hr. . � ( <br />DEV. Qp DEV. Qp <br />IN OUT <br />.46 .16 <br />Flow exiting the detention system will be routed to a SSMH within the Rainier Ave. ROW <br />and continue through the public Sanitary Sewer System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.