My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1130
>
WHOLE SITE DOCUMENTS
>
1130 RAINIER AVE WHOLE SITE DOCUMENTS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 8:09:08 AM
Creation date
2/24/2017 4:37:47 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1130
Tenant Name
WHOLE SITE DOCUMENTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Evereft Housing Authority <br />May 16, 2012 <br />ADDITIONAL SERVICES <br />❑ <br />JN 12080 <br />Page 13 <br />In addi�ion to reviewing lhe (inal plans, Geotech Consultanis, Inc. shouid be retained to provide <br />geotechnical consultation, testing, and observation services during construclion. This is to cenfirm <br />that subsurface conditions are consistent with those indicaled by our exploration, lo evaluale <br />�.vhefher earth:vork and foundation construcfion activities comply �vith Ihe general intent of lhe <br />recommendations presented in this report, and to provide suggestions for design changes in the <br />evenl subsu�ace conditiors d!(fer frcm lhose anfcip2ted p�inr to the s�art oi construction. <br />However, our �vork would not include the supervision or direction of ihe aclual work of the <br />conVaclor and its e�nployaes or agenis. Also, job and si;e sa(ery, and dimensional measurements, <br />�.viil be the responsibility of Ihe conlractor. <br />During the conslruction phase, we will provide geotechnical obseriation and tesling services when <br />requesteC by /ou or your representztives. Please be av.�are lhal �ve can only document site work <br />�ve actually observe. It is still the responsibility of your contractor or on-site construction team to <br />verify that our recommendations are being follo�ved, �vhslher v�e are present at lhe site or r,oi. <br />The scope of our work did not include an environmental assessment, but �^;e can provide this <br />service, if requested. <br />The rollo:ving plates are aHached to complete this report: <br />Plate 1 <br />Plate 2 <br />Plates 3 - 8 <br />Piate 9 <br />Vicinity Map <br />Site Exploration Plan <br />Test Boring Logs <br />Typical Footing Drain Detail <br />We appreciate the opportunily to be of service on this project. If you have any queslions, or if we <br />may be of further service, please do nol hesitale lo contact us. <br />DR\N: jyb <br />Respectfully submitted, <br />Principal <br />GEOTECH CONSULTANTS, INC <br />iANTS, INC. <br />�bl ( 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.