My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1529 RAINIER AVE 2016-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
1529
>
1529 RAINIER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:34:51 AM
Creation date
2/24/2017 4:47:15 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1529
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC lNORKS PERIlAIT <br />City of Ev�rett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 9/17/2009 <br />Public Works Permit #: PW0909-01� <br />Buildinq Permit#; 60909-012F,,,� I <br />Planninp Reference #: ' .; � <br />Public Works Fee $: $ 25.OU <br />Other $: <br />OWNER NAME AND ADCRESS: APPUCPNT NAME AND ADDRESS: <br />SHERLOCK FRANK D JR <br />1529 RAINIER <br />EVERETT WA 98201 <br />PHONE: 4252525874 PHOI�E: <br />TAX PARCEL IDu 004388308014G0 SITE ADDRESS: i529 RA�NIER AVE <br />DESCRIPTION OF PROPOSED WORK: <br />DETACHED GARAGF <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. Ail work shall be performed in accordance with the permit and current City of Everett Design and Construction 8tdndards <br />and Specifications. <br />3. Cail Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 � <br />4. The contractor must mi�et with the Public Works Inspector, Randy Allen at 425-339-7403, to discuss potential : <br />drainaye routing prior to b.ginning the project. � � <br />5. Install erosion control measures as determined by !he Public Works inspector, such as silt f_ence,straw bales, : <br />swales, or erosion blankets. �'; ` <br />6. Remove erosion control measures upon completion of the project prior to final approval'of the per 'm'it. � <br />7. No dirt, mud, rocks or debris to be tracked onto roadway. <br />8. Pave driveway from the property line out to the alley paving <br />9. The side sewer that runs under the new building may have to be updated. Discuss this with the inspector. <br />_� <br />�r. <br />TO POSTING `'/y ,` _ :_� � �� =- <br />,�,�' , . <br />INS <br />as Constructed <br />y -/7-09 <br />Date <br />3_�j_�o <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ow�er/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, cosis, expenses, or causes of action that may arise <br />because of installation and maintenance ot the improvement <br />or other right-of-way use hereto applied for and IuAher agrees <br />to remove same upon notice trom the City and to repiace <br />public property damaged thereby. <br />��%,,..i/ � ..D�.�,.-�--� 9- l3`D� <br />Signature of Applicant <br />Date <br />INORK AUTHORIZED 8Y THIS PERh1R P1UST BE STARTED WITHIN I80 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO C0�IPLETION. TI115 PERNIT MAY BE UNCELLED BY THE CITY UVOY ANY STOPPAGE OF WORM.! �Y THIS PRO)ECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.