Laserfiche WebLink
everett INSPECTION REPORT <br />ea;n2Address —va <br />ce�1 <br />Contractor <br />Owner <br />Date r� T� Uq— <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. _ —_ PLBG: Pmt. No. c <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork Q Grid ❑ Slruct. Slab <br />❑ Wood Stove Qd Rough -In ❑ Final <br />❑ Masonry ❑ Service <br />)KL_&PP_E1pVAL- ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector '^ ��� Date' "� <br />