Laserfiche WebLink
1,0 PHA CObNITi ENT <br />r *OF 2 <br />2-28-77 <br />FHA CASE NO. 561-411388-221 <br />ADDRESS 1827 Rainier Ave <br />Everett. W shi nqtori <br />ific commitment conditions (applicable when checked) <br />. All required repairs must be completed in a professional manner. <br />All certifications and/or pest control certificates of completion must be submitted before <br />requesting final inspection of repairs. Note: If VC-15 is required, it is recommended <br />this certificate be obtained before any other certifications are obtained and anv repair <br />1 /J If property is sold under Section 221(d)(2) a certificate of compliance with the <br />minimum housing code will be required prior to request for inspection of other addendum <br />requirements. If there are no addendum requ'..,mentc, the certificate may be submitted <br />with closing documents. <br />2 © Submit certification from the local authority having jurisdiction that the subject <br />property is in compliance with the Local Minimum Housing Code. <br />.3 0 Submit certification from a state licensed pest control operator that wood destroying <br />organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, have <br />been eliminated. Attach list of any repairs or corrections completed in connection <br />with above certification. A "Standard Notice of Work Completed" or a report form <br />indicating no infestation may be submitted as certification. Note: All repairs must <br />be completed in a professional manner and in compliance with local building codes. <br />,4 Q Q (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br />plumbing, roofing, and r.eatLng). The required certificate(s) is (are) being ordered <br />and will be paid for by HUD. Cost of additional certificates or required repairs shall <br />be borne by the Seller. <br />G (b) Reinspection to examine the following system(s) not in operation at the time <br />of our appraisal is required. Please notify the Valuation Branch of this office in <br />writing wfien ready for inspection: <br />Qplianbing L% heating L7 electrical <br />Correction of any deficiencies found is a specific condition of this commitment:. <br />Indicated system(s) shall be operable and inspection completed prior to the request <br />for conversion to a firm commitment. <br />L5 G F'urnish evidence from the local health authority indicating approval of the <br />D individual water supply system, 0 individual sewage disposal system. <br />it is recommended the above evidence of approval be obtained before commencing any <br />other required repair work. <br />L6 0 O (a) Re -roof O dwelling and O garage with minimum 235y self sealing composition] <br />shingles or #1 cedar shingles, and repair sheathing and install new £lashings as necessar, <br />Remove all old roofing when two or more layers exist. <br />8 (b) Repair roof of D dwelling and/or /7 garage to an acceptable condition. <br />(c) Re -roof built-up roof: After removing all old roofing, install min. 3 ply -hot <br />mopped 15/ felt roof with flood coat and 40o;?? gravel per 100 sq. ft. <br />7 (d) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br />surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. <br />Replace gravel and flashing and properly seal all gutters and apertures, <br />17 0 Paint all exterior metal and wood trim of Q house and/or %% garage after adequately <br />preparing surface. In rooms with openable windows, at least one must be free and operablt <br />18 L7 Paint entire exterior of L7 house and/or 0 garage including trim. Prepare surface <br />by repairing all damaged and deteriorated areas, remove all loose paint and blisters and <br />apply an undercoat to all bare wood. In rooms with openable windows, at least one must <br />be free and operable. <br />19 Q.-emove the existing floor covering in the following rooms: <br />Replace with new resilient floor covering over suitable underlayment after making <br />necessary repairs to subfloor. <br />20 Q Submit statement from purchaser acknowledging wall-to-wall carpet as the finished floor <br />in the L7 kitchen 0 bathroom. <br />Form 1019-Q-113 (Rev. 8-1-75) <br />M <br />r- <br />