Laserfiche WebLink
PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />00 3200 Cedar Street <br />Everett, WA 98201 <br />t425) 257-8810 <br />9/13/2005 <br />Date <br />PWO509-018 <br />Public Works Permit If C0508-029 <br />Bidding Permit # <br />Planning Reference # <br />Public Works Fee $ $25 .00 <br />Guarantee $ <br />NAME <br />AND ADDRESS: <br />1931 RAINIER AVE <br />AND ADD ESS <br />EVERETT WA 982ol <br />4253437273 <br />PHONE: <br />PHONE: <br />TAX PARCEL I.D.If <br />PROJECT ADDRESS: i <br />2 STORY ADDN 6 DETACHED GARAGE <br />DESCRIPTION OF <br />PROPOSED WORK: <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />7. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424.5555 <br />4. Revise pifje material for side sewer under pU rosed garage oL Lr-coot -.._ <br />attached. / plot-&tJ S/• C� Ptd /S C L' t�0 <br />S. Connect all rooftop downspouts to the side sewn. <br />b. Pave driveway from the front property line out to the street paving. <br />TO POSTING q 1 <br />FINAL INSPECTION <br />Approved as Constructed Dale <br />ACKNOWLEDGEMENT OF CONDITIONS <br />n <br />7 <br />01 <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of ac-ion that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />prpperty damaged thereby. <br />Au pat%l' ; ! o /0 -X -o <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />