Laserfiche WebLink
INSPECTION REPORT <br />Date: Permit: <br />Contractor: <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑ Temp Service ❑ LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br />❑ Groundwork ❑ Footing ❑ Rough in ❑ Rough In <br />❑ SlablConduil ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing " ❑ Rooftop Units ❑ Water Service <br />❑ Grounding ❑ Insulation ❑ Mechanical Final ❑ Medical Gas <br />❑ Ceiling Grid ❑ Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Roof Nailing ❑ Rough In/Service Hot Water Tank <br />❑ Footing drains ❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Root drains ❑ Building Final ❑ Gas Pipe Final ❑ HWT Final <br />OTHER OR CONSULTATION. �-!- ,1 e s r? 11 �P L(/ <br />❑APPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FORT C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: El <br />❑ CALL (425) 257.8881 FOR REINSPECTION .24 hour notice required <br />T-D F ` — <br />i <br />Inspector: // <br />//%�i L / <br />Date: <br />