Laserfiche WebLink
. �� <br />CLOSED CM WORK ORDERS REPORT <br />' Total Utility Maintenance Management System <br />11/O1/1994 Page 1 <br />-------------------------____________________________________________=__________ <br />Date Range :10/O1/1992 - 10/27/1994 <br />CM Work Order Range :<Blank> - 8405421080001 Pattern :7401196751027 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORK ORDER ID: 7401196751027 Title: CONVERT 2109 RAINIER �W ( <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS2095F064 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 10/21/1994 <br />Overall Craft: <br />Issued: 10/17/1994 <br />out of Service? NO <br />Meter P.eading: <br />Downtime: 0 hours <br />status: <br />Labor: <br />Craft ID <br />UL LMA <br />UL NSO <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />COUP32137647 <br />COUP34004347 <br />ELL034101447 <br />METE36089447 <br />PIPE34060647 <br />VALV34008348 <br />Name <br />LIBBING, <br />NIEISEN, <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Planned Hrs Actual Hrs <br />- -- -- -- ---------- <br />MAURICE A. 0.00 3.00 <br />SCOTT O. 0.00 3.00 <br />Description <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />SOX METER PLA 15" X 10" W/LID <br />COUPLING 1/2"COP X 3/4"MIP @ <br />COUPLING 3/4" MIP X COP ELL @ <br />ELL 3/4" 90 DEG BRASS ' <br />METER 5/8" * NO REMOTE READER <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" IACK WING IP@ <br />Vehicles: <br />ID Description <br />����L������� ����������������� <br />V2139 SVC TRUCK CHEV 86 <br />Work Description: <br />------------------------------- <br />METER# 39594208 <br />Total Labor Cost: <br />Date <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br />10/21/1994 <br /># Used <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />2 <br />Total Material Cost: <br />Date Aours <br />���������� �������� ������ <br />10/21/1994 3.00 <br />Total Vehicle Cost: <br />--------------------------------- <br />Cost <br />41.04 <br />43.68 <br />84.72 <br />Cost <br />7.29 <br />15.18 <br />6.98 <br />12.30 <br />4.82 <br />3.57 <br />1.21 <br />26.14 <br />0.96 <br />16.06 <br />94.51 <br />Cost <br />15.30 <br />15.30 <br />