Laserfiche WebLink
PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA B8201 <br />OL'42''2�aB'POSTING oEc 1 z003 <br />OWNER NAME W wC ern APPLICANT NAME <br />ANDADDRESS. 2114 RAINIER AVE ANDADDRESS'. <br />EVERETT WA 98201 <br />PHONE: 3606592706 P'1oNE. <br />TAX PARCEL I.D.x PROJECTADDRESS'. <br />DESCRIPTION OF <br />PROPOSED WORK <br />PERMIT CONDITIONS <br />Date <br />Public Works Permit e <br />Building Permit a <br />Planning Reference a <br />Public Works Fee S <br />Guarantee $ <br />09/26/2002 <br />PW0209-041 <br />90209-032 <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 ; Is. before you dig. TOLL FREE NUMBER 1-ODO-424-5555 <br />(-4. Sewer chart shows the sewer line runs under the new garage. <br />with ARS pipe if line stays under the new garage. If line is <br />around the foundation, use 3034 rubber gasket PVC pipe. <br />5. Tie garage roof drains into sanitary sewer. <br />0tj1\Q."" jS -sea.� Gln�(Pil <br />P roved onstruc D e <br />FINAL INSPECTION <br />Approved as Constructed Dale <br />10-04-02 1:55PM <br />h 209032 <br />BUILD 195.25 <br />SRC4G 4.50 <br />N 207028 <br />SEWER 30.00 <br />TOTAL 229,75 <br />A OM9934 <br />$25.00 <br />Replace W <br />rerouted �.. <br />V+ <br />CHEF: <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/'applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon nottro he City and to replace public <br />Werlydged Ili yI c nl Date -- <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREATTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />