My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2128 RAINIER AVE 2018-01-02 MF Import
>
Address Records
>
RAINIER AVE
>
2128
>
2128 RAINIER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 9:36:26 AM
Creation date
2/24/2017 5:20:07 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2128
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 * <br />Gas Installation Permit INSPECTION DIVISION <br />City of Everett DEPARTMENT OF PUBLIC WORKS <br />Date L'— •�'1/"l <br />Appliances <br />No. <br />Conversion Unns <br />to 400.000 BTUs <br />Conversion Units <br />over 400,000 BTUs <br />Cookstoves <br />Range Tops — Oven: <br />Furnaces to 400,000 BTUs <br />Furnaces over 400,ODO BTUs <br />Space Heaters to 70,00C BTUs <br />Space Heaters over 70,007 BTUs <br />Fireplace Log <br />Water Heaters <br />Piping <br />Pipe in excess of 60' <br />Clothes Dryers <br />Air Conditioning Units <br />Boiler <br />Permit Fee . . . . $ <br />City of Everett, <br />—IMPORTANT NOTICE — <br />All work must conform to the provisions of the ordinances of the City of Everett, <br />Washington. It is the responsibility of the Permit Holder to see that City Inspection <br />Division is notified and the installation inspected before covering. <br />Remarks and Correcti <br />Inspection — Date _ Inspector <br />Call Back — Date Inspector <br />Final — Date_ Inspector <br />This Permit must be posted on Job before Starting Installation. <br />Permit 3 315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.