Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />04/08/1997 Page 2 <br />Date Range :01/09/1989 - 03/31/1997 <br />CM Work Order Range :1001091070001 - 7401196770910Pattern :7101096750223 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />:xzzzzxsazzzxzzzxavxxxxxxxxzxxxxx-------- <br />--------==xc_xxxcxxx=cxxxxxxx _---- <br />CM WORK ORDER ID: 7101096750223 <br />(contin,_ed) <br />V2053 '86 <br />V2152 87 <br />V2231 90 <br />V3603 86 <br />CHEV 1/T PU <br />DODGE W/HOIST <br />FORD DUMP 5-YARD <br />CASE BACKHOE 780 <br />1.00 <br />9.50 <br />8.50 <br />9.50 <br />4.80 <br />45.60 <br />88.40 <br />376.20 <br />Total Vehicle Cost: <br />515.00 <br />Work Description: <br />--------------------------- -------------------------- <br />_ __________ __________ <br />REPLACED 10' OF 8" MAIN AND SIDE SEWERS FOR 2128 RAINIER AND 2125 MCDOUGALL <br />TO PROPERTY LINE. MAIN 9' DEEP 2125 MCDOUGALL STANDPIPE 7' DEEP, SIDESEWER @ <br />PROPERTY LINE 6' DEEP. 123' NORTH OF MANHOLE @ 22ND. 2128 RAINIER STANDPIPE <br />7' DEEP, SIDESEWER @ PROPERTY LINE 6' DEEP 115' NORTH OF MANHOLE @ 22ND <br />Total cost for work order 7101096750223: <br />1152 06 <br />