Laserfiche WebLink
� <br />CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />___________________________________06/02/1995=====____________________� Page=1== <br />Date Range :O1/09/1989 - 05/31/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751151 <br />Item Range :<Blank> - W4122020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />___________________________________________________________________________ <br />CM WORK ORDER ID: 7401196751151 Title: CONVERT 2309 RAINIER F���£ <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Ztem ID: WS2095L054 -- WATER SERVICE <br />Location ID: -' <br />Program 740 Function 119 Activity 675 <br />Date Completed: 05/18/1995 <br />overall Craft: <br />Issued: 05/17/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL SSJ <br />WST WDT <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />METE36089447 <br />NSPP34131247 <br />PIPE34060647 <br />SHAN34097247 <br />VALV34097448 <br />Issued by: JSM Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />SMITH, STEVE J. <br />WALDEN, DAROLD <br />--------------- <br />T. <br />Planned Hrs Actual Hrs <br />0 00 3.00 <br />0.00 3.00 <br />Total Labor Cost: <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />NIPPLE 3/4" CIASE BRASS <br />PIPE 3/4" POLY I.P.S. <br />SHANK 3/4" METER "BRASS" @ <br />VALVE ANGLE CHECK 3/4" @ <br />Date <br />05/18/1995 <br />05/18/1995 <br />O5/18/1995 <br />05/18/1995 <br />05/18/1995 <br />05/18/1995 <br />05/18/1995 <br />05/18/1995 <br />jj used <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Vehicles: <br />ID Description Hours Cost <br />------------ ------------------ <br />------------ ------ -------- <br />V2117 91 CHEV 1-TON HYD UNIT 3.00 _____16_80 <br />Total Vehicle Cost: 16.80 <br />Work Description: <br />--------------------------------------------------------- <br />METER# 40304261 <br />Cost <br />45.09 <br />60.24 <br />105.33 <br />Cost <br />------7.97 <br />7.26 <br />12.94 <br />27.90 <br />0.77 <br />0.25 <br />3.08 <br />11.86 <br />72.03 <br />