Laserfiche WebLink
S <br />CLOSS'D CM P�O� ORDBRS RSPORT paqe 1 <br />Total Utility Maintenance Management System ------------------ <br />10�2��199�_____________________ <br />- 10/09/1997 pattern :7101196751204 <br />Date Range 01/09/1989 _ �p021-35- .* <br />:1001091070001 pattern • <br />CM Work Order Range _ �3694L05 __- <br />Item Range :<Blank> pctivity �L _________________________________ <br />Program ALL Function_�L_________________________ <br />7101196751204 Title: RENEW .75 INCH 2314 RAINIER AVE <br />ao3-eevee-a-- <br />CM WORK ORDER ID: <br />«DUPLICATE PRINTING OFWATER SERVICEDER» <br />item ID: WS2095L040 - __ Activity 675 <br />Location ID: Function 119 <br />Program 710 10/07/1997 <br />Date Completed: <br />Overall Craft: <br />Iasued. 09/OS/1997 <br />Out of Service? NO <br />Meter Readingo hours <br />Downtime: <br />Status: <br />Materials: <br />ID <br />pDpp34000347 <br />ADAP34000547 <br />BOX000056247 <br />COUP34003947 <br />COUP34004447 <br />ELL034101447 <br />N/A <br />NIPP3413124� <br />Assigned to: <br />Issued by: GJ p,00 Hr. <br />Travel Time: <br />Priority: <br />Description ______ <br />p,�ppTER 3/4" CST X INSTA-TITEC�J <br />ADAPTER 3/4" MIP X INSTA-TITEO <br />gOX METER PL� 154 BE�� W�LID <br />COiJPLING 3/4" 1/ COPPER@ <br />� <br />COUPLING 3/4" MIP X COP <br />ELL 3/4" 90 DEG BRASS <br />TRACIrG WIRECLOSEMBI2ASSK, � <br />r7IppLE 3/4 <br />PIPE 3/4" pOLY I.P.S. (H9"; <br />Date <br />09/25/1997 <br />pg/25/1997 <br />pg/OB/1997 <br />09/25/1997 <br />09/08/1997 <br />09/OB/1997 <br />09/25/1997 <br />09/08/1997 <br />pg/25/1997 <br />09/08/1997 <br /># Used Cost <br />Z 16.18 <br />z 16.76 <br />1 12.98 <br />1 7.53 <br />1 3.59 <br />1 1.3 <br />60 '6 <br />1 0.79 <br />12.00 <br />60 41.10 <br />�i <br />PIPE3406064 118 BO <br />SETT34146547 SETTER COP 5/8" X 3 4 Total Material Cost: � <br />---------- <br />-------- �12_�g- <br />Work Description: <br />REF. WATER I'�fAIN CONSTRUCTION WD#710-119-673-0249 119•89 <br />Total cost for work order 7101196751204: <br />