Laserfiche WebLink
Date --T - <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Mai'mg <br />Describe Proposed Work <br />Project Address (if known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines <br />• Outline and dimensions of all existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />Public Works Permit . �,+C('o /fit <br />Bldg Dept • —�/ _�/�`' —_ <br />Public Works Fee <br />Total Fee $ <br />Less spot Fee Paid $ <br />Balance Dun S 203r <br />• Centerline of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />Phone <br />Phone <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Cell Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424-5555. <br />4, (xAj �M.izp ser tAcK ill vxoM <br />1ReVz- t�u'FeZ-V1 L 1 NE al <br />M 41,601 <br />Approved for, CCoon�sttgtion Date <br />FINAL INSPECTION <br />Approved as Constructed <br />everetl PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett. WA 98201 <br />Phone: 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />O <br />P <br />O <br />a <br />The undersigned owner/applicant hereby agrees to (Told and save harm. <br />less the City of Everett from any and all claims for damages. costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the Improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. (y� <br />cxe— <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION, THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />