Laserfiche WebLink
Board of Directors <br />Roy Yates <br />ProuCanl <br />Karen Madsen <br />V¢e�Rev0anl <br />Sue Cooper <br />Kristie Dutton <br />Paul RobeNs <br />Cerol W�ilehead, Etl.D. <br />suoennrxneanl <br />� <br />... <br />i �� � <br />� � <br />iYt(Ql� ��I( S(i100�S <br />April 22, 2002 <br />Tony I.ee <br />City of Everett <br />3200 Cedar Street <br />Everett, Washington 98201 <br />�� <br />Project: Maintenancc Operations Building <br />Job Address 2222 Everett Avenue <br />Plan Review Number: B0202-025 <br />Project: Vehicle Maintenance Building <br />]ob Address 2720 Rainicr Avcnuc <br />Plan Review Number: B0202-026 <br />Dear Mr. Lee: <br />This letter is in response to a question in th.; plan review notes and issues raised <br />during a meeting with Scuu Conr�or, Klappenbach Architects and Judy <br />Nicholson, Everett School District where the usc under the canopies on each of <br />the buildings were discussed. <br />The canopies on each of these buildings werc designed as weather protection for <br />loading and unloading at the service doors at the buildings. We will �iot be using <br />dte canopies for storage or a.r n work spacc once we move nur operntions m <br />these nvo new buildings. <br />CC: Judy Nicholson, Everett School District, Planning <br />Dale Klappenbach, Klappcnbach Architects <br />Maintenmice Deparfinent <br />2302 Everet� A�'enue, Evered, WA 9820! <br />Telephone: (425) 388-4770 • Far: (415) 388-4775 <br />