My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 RAINIER AVE B 2016-01-01 MF Import
>
Address Records
>
RAINIER AVE
>
2018
>
2018 RAINIER AVE B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 8:28:09 AM
Creation date
2/24/2017 6:51:12 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2018
Unit
B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � � <br />' REPAIR SPECIF' 'ATIONS AND LIST OF WORR 0 BE BID <br />2018 Rainier page 2 of 5 <br />1• Gutters & Downsoouts 'Remove all existin <br />downspouts from house. Replace any rotted gfaciaeboards <br />to match. install new continuous aluminum gutters and <br />downspouts, 5", "R" style, anodized finish, owner choice <br />of color. Provide splashblocks at all downspouts. <br />Secure gutters to rafter tails 48" O.C. Secure <br />downspouts top, bottom and at all joints. Slope gutters <br />to drain to downspouts. <br />z. <br />3. <br />4. <br />s CnIOQ Gv <br />Foundation Remove wood skirtinq on house complete. <br />Bring floor over post and pier foundation to a <br />reasonable level. Replace any rotted posts and all <br />unstable post and pier combinations to code. Frame <br />backing foz new skirting on perimeter of house, bottom <br />chord : pressure treated. Install new concrete asbestos <br />board skirting, 1/8", on perimeter. Provide vents on <br />each elevation for cross ventilation, .5 sq, ft, open <br />area for each vent. • <br />$—�f�., ILL� �G <br />Porch Work Tear off existing decking on front porch <br />complete. Tear off board trim around deck, (1 x 10). <br />replace decking with new tongue and groove deck boards <br />and replace board trim around deck. Remove and replace <br />front steps to walk, three equal risers, nominal 2 x 12 <br />clear treads. Repair post in northeast corner of deck. <br />Install new railing to code doWn back steps : maximum 6" <br />space between ballusters, handrail 30 - 34" above tread � <br />nosinq, railing 36" above tread nosing. Handrail : run <br />down east side of stairs. <br />- � $_ D. � . <br />Exterior Paint Power wash exterior siding complete. <br />Scrape any loose or peeling paint down to bare wood on <br />sidinq and trim. Caulk all openings on exterior around <br />tcim on doors and windows. • prime all new and bare wood <br />with oil. base primer. Paint house complete with two <br />coats exterior grade oil base paint, owner choice of <br />color, two colors. Paint front and rear deck and steps <br />with oil base deck paint with abrasive admixture, owner <br />choice of color. <br />�� � ' <br />5• Interior Paint Prepare all interior walls and <br />ceilings for paint. Scrape all loose or peeling pairst. <br />Remove tape, staples, loose wallpaper throughout. Patch <br />plaster cracks and holes. Clean walls. Apply spray <br />texture, knock-down finish on all walls and ceilings. <br />Paint walls and ceilings two coats latex paint, owner <br />choice of colors. <br />z <br />0 <br />� <br />� <br />m <br />=� � <br />..� <br />N 2 <br />m <br />c v <br />m o <br />-i c <br />� m' <br />_ -�i <br />m <br />.o z <br />c <br />a -i <br />r x <br />.. .. <br />-1 tn <br />< <br />� <br />o� <br />T � <br />-i m <br />x <br />m � <br />� <br />o r <br />�� <br />N <br />m' <br />�� <br />m <br />a <br />z <br />-a <br />x <br />a <br />z <br />� <br />� <br />N <br />z <br />0 <br />� <br />� <br />m <br />; <br />
The URL can be used to link to this page
Your browser does not support the video tag.