My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3608 NORTON AVE 2016-01-01 MF Import
>
Address Records
>
NORTON AVE
>
3608
>
3608 NORTON AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 8:07:35 PM
Creation date
2/24/2017 8:07:30 PM
Metadata
Fields
Template:
Address Document
Street Name
NORTON AVE
Street Number
3608
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 04/24/1995 Page 1 <br /> ----------------------------------------------------______________�____��_�__��_� <br /> ---------------------------------------------------- <br /> Date Range :O1/09/1989 - 04/20/1995 <br /> CM Work Order Range : 1001091070001 - E801086100085Pattern :7401196751205 • <br /> Item Range :<Blank> - WW22o20001 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORDER ID: 7401196751205 Title: CONVERT 3608 NORTON �fL <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS3095Q047 -- WATER SERVICE <br /> Location ID: -- <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: 04/17/1995 <br /> Overall Craft: <br /> Issued: 04/11/1995 Issued by: SKL Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- -----•----- ---------- <br /> UL SSJ SMITH, STEVE J. 0. 00 3 .00 45.09 <br /> WST WDT WALDEN, DAROLD T. 0. 00 3 . 00 60.24 <br /> Total Labor Cost: 105 33 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ 04/17/1995 4 29.92 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 04/17/1995 1 12. 27 <br /> COUP34004647 COUPLING 3/4" ANG MET X FIP @ 04/17/1995 1 4.44 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ 04/17/1995 1 5.36 <br /> ELL034101447 ELL 3/4" 90 DEG BRASS ' 04/17/1995 1 1.28 I <br /> ELIA34104247 ELL 3/4" STREET BRASS ' 04/17/1995 1 1. 68 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 04/17/1995 1 27.90 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 04/17/1995 3 0.72 � <br /> VALV34008348 ,VALVE METER 3/4" IACK WING IP@ 04/17/1995 1 8.24 i <br /> Total Material Cost: 91.81 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- ' <br /> V2117 91 CHEV 1-TON HYD UNIT 3 . 00 ].6.80 <br /> Total Vehicle Cost: 16.80 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> METER# 40304319 <br /> ��,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.