Laserfiche WebLink
CiASSD QIIIORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> � ----�-- 07/22/1496 Page 1 <br /> - ------_-------=�_----��_-__�---=------_---- <br /> Date Ranqe :O1/09/1989 - 07/09/1996 ��� <br /> C!t Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101196750728 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Proqram �I.I, Function aLi. Activity AI,L <br /> � <br /> Cli WORK ORDffit ID: 7101196750728 Title: CONVERT 1316 OAKES /}�L- <br /> «DUPLIG►TE PRINTING OF THIS WORK ORDEFt» <br /> Item ID: WS1795N030 -- WI►TER SERVICE ' <br /> Location ID: -- <br /> ProqL�am 710 Function 119 Activity 675 <br /> Date Coapleted: 07/09/1996 <br /> Overall Craft: <br /> Issued: 06/07/1996 issued by: WMW I►ssigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: o hours <br /> Status: <br /> Iabor: <br /> Craft ID Name Planned Hrs actual Hrs Cost <br /> ---- ------ ------------------------------ ----------- ---------- ---------- <br /> UL GDJ GOSS, DIlNNY J11MES 0.00 3.00 38.19 <br /> WST LDS LOFLING, DELMAR S. 0.00 3.00 61.92 <br /> • Total Labor Cost: 100 11 <br /> llaterials: <br /> ID Description Date �' Used Cost <br /> ------------ ------------------------------ -------- -------- ---••------ <br /> AD]►P34000547 aDl►PTER 3/4^ MIP X INSTA-TITE@ 07/09/1996 3 23.04 <br /> BOX000056247 BOX I�IETER PI.7� 15° X 10" W/LID 07/09/1996 1 12.96 <br /> COUP34004047 COUPLING 3/4^ 1/8 BEND COPPER@ 07/09/1996 1 6.74 <br /> ELL034104247 8LL 3/4^ 90 DEG STREET BRASS ^ 07/09/1996 3 5.28 <br /> 1[ETE36n89447 METER 5/8^ X 3/4" NEPTUNE T-10 07/09/1996 1 30.67 <br /> PIPE34060647 PIPE 3/4n POLY I.P.S. 07/09/1996 3 0.72 <br /> Total Material Cost: 79.41 <br /> Vehiclas: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2146 87 CHEV 1 TON W/HYD. UNIT 3.00 15.30 <br /> Total Vehicle Cost: 15.30 <br /> Work Description: <br /> --------------------------------^---------------------------------------------- <br /> METER�' 41508128 <br /> ---------- <br /> Total cost for work order 7101196750728: 194.82 <br />