My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 OAKES AVE 2016-01-01 MF Import
>
Address Records
>
OAKES AVE
>
1410
>
1410 OAKES AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 8:57:31 PM
Creation date
2/24/2017 8:57:22 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
1410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT BOARD OF ADJUSTMENT <br /> ORDER <br /> �- Wt{ERFAS, there was filed with the City of Everett Buiiding Division on (date) June lo, <br /> 19a3 an appiication for a variance of Section No. 19.16.o5os <br /> of Everett <br /> Municipal Code Chapter 19 by (applicant) Robert Harper, i410 oa�ces <br /> (address) Everett, wa 98201 <br /> for (specific variance requested) sideyard setback which requires each building to be <br /> a minimum of 5 feet from side yard oroperty line. <br /> The apulicant is requestina to build 1 inch from <br /> that oroperty line. <br /> on the following described property: <br /> : Lots 27 & 28, Blk. 290, Fourteenth St. <br /> � <br /> � AND, WHEREAS, June z�, 1983 was fixed as the date of hearing <br /> on said application and proper notice having been given as required by law, and <br /> WHEREAS, a public hearing was held on said date and the City of Everett Board of <br /> Adjustmmt, after reviewing all tesumony, made the following findings, conciusions and decisions: <br /> APPROVE: <br /> 1. Meet all Building Deot, requirements <br /> NOW, THEREFORE, based on the foregoing findings, conclusions and decisions: <br /> BE IT ORDERED BY THE CITY OF EVcRETT BOARD OF AD7USTMENT that said <br /> application be qrantea � �d <br /> BE IT FINALLY ORDERED that a copy of this written �rder be transmitted to the applicant. <br /> DATE OF ACTION: June z7, 1983 <br /> If no building permit has been obtained within one year from the date of this action this order is <br /> void. <br /> 1/ �e L�� ���� <br /> I Chauman � <br /> BOARD OF ADJUSTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.