Laserfiche WebLink
ttLYN1H 5rt�1t'1�ATIONS A�D LIST OF WORIC TO BE BID <br /> ' � Page 5 of 7 <br /> Address ; 2002 Oakes <br /> 11. Doors 8 Railinas Prepare existing main floor bedroom <br /> closet opening and install pcefinished hollow core flush , <br /> panel mahogany bifold doocs (fill 5 ' 0" opening) � <br /> ' complete with hardware and trim. Install a pcefinished ! <br /> 28" hollow core mahogany pocket door complete with frame � <br /> and hardware (including latch) in new side porch toilet <br /> room wall. <br /> • Remove front door and frame complete and install a <br /> prefinished 3 ' 0" solid core prehung door , Simpson Speak <br /> ease or equal, opening up front wall on the opening <br /> south side to make installation. Complete the <br /> installation with wide wood trim moldings to match <br /> existing. � <br /> H <br /> Replace back door with new 2' 8" prefinished prehung (� <br /> solid core exterior door slab with small 18" x 18" <br /> window complete with trim. <br /> Both new front and backdoors to be installed complete M N <br /> with entrance locksets, single keyed deadbolts (all � '� <br /> keyed alike) , thresholds and weatherstripping. Door y �H <br /> locks to be polished brass, Schlage or equal. Owner to � t� <br /> select door finish colocs for all doors called out in <br /> this item. � <br /> Storm doors. Install a 36" heavy duty prehung crossbuck � <br /> style storm - screen front door with tempered, glass z <br /> insert, weatherstripped. Door, Tesco or equal, to have <br /> piano hinge and dura bronze finish. install a 32" heavy � <br /> duty screen door (no glass) , Universal or equal , with y <br /> expander hinge (piano) and dura bronze finish. Door to '� <br /> go at side (back) entrance. � ;� <br /> yl. <br /> Railings. Install a wood handrail along the outside F� � <br /> wall over staics to the second floor from top to bottom � <br /> complete. <br /> All new work to be performed in compliance with the � <br /> Uniform Building Code, 1982. <br /> $ � y d � � <br /> 12. Paint Contractor to give the rebuilt side porch � <br /> exterior two coats of exterior oil base paint. Paint H <br /> the front porch railings and posts flat and �' <br /> paint out � <br /> the entire front porch floor and trim with at least two <br /> coats of oil base floor and deck enamel, the first coat � <br /> to be thinned for penetration into dry wood per <br /> manufacturers recommendations. Owner to select the <br /> paint colocs. <br /> All other worked areas of the house will be painted by <br />� the owner . This includes all new sheetrocked areas <br /> called out in the spec. Contractoc shall provide a $150 <br />� allowance for paint materials to the owner . <br />! $ � y G� <br /> „s._ <br />