My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2121 OAKES AVE 2016-01-01 MF Import
>
Address Records
>
OAKES AVE
>
2121
>
2121 OAKES AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2017 10:28:10 PM
Creation date
2/24/2017 10:28:01 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2121
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ � +" <br /> Plan Check No. 40646 <br /> May 21, 1993 <br /> Page Two of Two <br /> 5. Provide a detail of the intermediate supports. Apo sitive connxtion shall be provided to <br /> ensure against uplift and lateral displacemend2516(m). <br /> 6. When the valuation of an addi8on, alreradon or repair to a Group R Occupancy eacceds <br /> S1W0 and a permit is requiced smoke detectors shall be installed in accordance with <br /> subsection 3, 4 and 5 of Section I210 of Uni(orm Building Code. Smoke detectors may <br /> be wlely battery operated when instal(ed in existing buildings. In dwelling units, a <br /> dctecror shall be mstalled in each sleeping room and at a point centrally located in the <br /> corridor or area giving access to each separale slceping area. When lhe dwelling unit haz <br /> more than one story and in dwellings with basements, a detector shall be installed on each <br /> srory and in Ihe basement. <br /> 7, He advised that a certification of non-conformance may be required by the Planning <br /> Department you may wish to contact the Planning department at 259-8731, immediately <br /> so as not to slow the process of obtaining a building permit. <br /> In order for the processing of your application ro continue, it will be necessazy ro provide the <br /> 6uilding Division with two comple�e new sets of drawings retlecting the cortecdons requested. <br /> Upon resubmittal of the drawings, your applica!ion will be given priority and plan review <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed swcwre will be constructed in compliance with all adopted codes. <br /> Sinccrely, <br /> Jeff Heilman <br /> Development Technician <br /> m:�c�ri•�aw <br />
The URL can be used to link to this page
Your browser does not support the video tag.