Laserfiche WebLink
� �RCCOMMENDATIONS AND QUOTA��ONS <br /> NOTICE: All work performed under these specitications is to meet standard good construction practices as to quality of workmanship <br /> end metorlels. Chemlcal epplicuUons shall Iw�wrlmmeJ by s�utc IicenwJ apPlicatws in cunlunnancu with all cunent fude�al,state and <br /> Ixal lawt. �uotations piven 6elow expire 90 days from [he date of this inspectiun report. Should you or any interested party elect <br /> to perform all or part of these work recommendations or should you engage a third party contractor,be sure you and all other parties <br /> fully u�darstand the standards upQ�wOh�h this report was issued as specified on page 2 arid 4,particularly item I I I, pa�agraph 2,and <br /> item IV. A roirspection fee of S '� will be charged tar each return visit tu the properry required to certily work of othors. <br /> State taz will be edded to charges quoted for chemical applications and structural correr.tions. It does not applY to inspection tees. <br /> CHEMICAL TREATMENTS <br /> Provide professional treatment for Powder Post Deetles b�� licensed personnel. � <br /> � <br /> 195.OQ .. <br /> 15,21 TAX <br /> �uotation 5�� <br /> I-I M <br /> � M <br /> STRUCTURALCORRECTIONS <br /> � � <br /> � <br /> � <br /> 1. Replace all damaged and or below-grade support posts to bear upon above-grade cencrete, � <br /> Install 6-inch pier blocks where necessary. M <br /> � z <br /> 2. Install concrete in area where foundation �iall is missing as indicated on diagram, y� <br /> 3. Remove existing wood skirtirg around house at; See dia�ram and replace �aitli a non-cellulose �' <br /> material such as concrete Soard. Install suffic ei nt piers and nosts and 2x4 backing for � � <br /> sound construction. The concrete board sliall he not less than 3/16-inch. <br /> 4. Install a .00G-mil plastic vapor barrier as required for com�lete coverage. P'astic to lie � N <br /> flat upon soil without extendin� up on piers, P.11oti•� a 6-inch lap whcrr joincd and hold in � <br /> place with non-cellulose o-ieighted objects. <br /> 5. A reinspection is necessary before a certification can be issued. , � <br /> There is no ��einspection fee when the chemical trnatment is rerfottred by FCON(1f1Y Pf:ST � <br /> CONTROL INC, as long as all structural repairs have been made in advance, <br /> � <br /> H <br /> N <br /> �3 <br /> H <br /> � <br /> � Total recommendations <br /> Total Quotations S 2��•Z� <br /> plus state tax <br /> � Recommendations continued on Page 7 pAGE 5 <br />