� REPAIR SPE�ICATIONS AND LIST OP WO�TO BE BID <br /> Paqe � � 1 I <br /> Address: d 4�� 0�1-�eS <br /> NOTICE TO ALL BIDDERS <br /> Although this job is being made available to bid at this date, <br /> the time of completion of the job may be as late as May 31, <br /> 1986, allowinq more time before construction must begin than is <br /> usual with CHIP contracts. <br /> 1. Foundat:on • Install new block foundation on <br /> cont�nuous concrete footings to code. Remove existina <br /> skirtinq and backing complete. Raise and support ho;�se <br /> foc new foundation. Tear off all perimeter skirting and <br /> supports. Excavate trench for new footing. Pour <br /> continuous concrete footitxg, 7" x 15", reinforced with <br /> two #4 bars on undisturbed soil. Install . new 8" <br /> concrete block foundation on footings, reinforced 48" <br /> O.C. maximum with #4 bars, grout cells containing bacs, <br /> tie block into sill plate. Lower house onto foundation, <br /> re-post and pier as necessary inside perimeter to level <br /> house and meet code. Install necessary vent blocks for <br /> floor insulation. Install pressure treated wood access <br /> door to crawl space, hinged and latched. Backfill and <br /> _� level g!ade a,: perimeter of house. Install new post on <br /> new 12" x 12" pier block under point load from post from <br /> southeast corner. of middle landing of stairs. <br /> s S.9Sa <br /> � <br /> 2. Dormers Refer to drawings £or design of new dormers <br /> over upstairs bathroom and middle bedroom. <br /> . k'alls : stripped to bare studs by owner. Contractor : <br /> cut holes in roof to provide clearance for new dormexs. <br /> Install framing for new dormer to code. Include 2 x 6 <br /> rafters. 2 x 4 stud walls, 4 x 4 headers for ��indows, <br /> and all necessazy blocking, shims and rafter headess <br /> ready for gypsum wallboard. Raftec framinq at rake edge <br /> : run north/south to provide support for rake overhang <br /> (lookouts) . <br /> Contractor . provide protection of property during <br /> construction and : responsible for any damaqe to the <br /> � house caused by rain damage. i' <br /> Install 1/2" CDX plywood or 7/16" waferboard sheathing <br /> on dormer walls and roof. install new 1 x 6 tight-knot <br /> cedar fascia on eaves and 2 x 6 barge boasd on gable <br /> ends to match existing. Install new plywood, 1/4" 303, <br /> on new soffit areas <br /> s 3 ,�00 <br /> 3. Roofing Tear off chimney complete from first floor <br /> up. Patch hole in roof with plywood, thickness to match <br /> level of existing roof after application of new roofing <br /> patch. <br /> Install 15� asphalt impregnated felt over dormer <br /> sheathing and patched area at ridge. Install metal drip <br /> edge, anodized aluminum, on dormer rakes and eaves. <br />