Laserfiche WebLink
` <br /> � la) �SacKground computa[ions ior s��inb arainagc iaciu�,�ea• � <br /> 6 (1) 7epiction of the drainage area on a ��po�raphical map of <br /> 7 approved scate and contour level with acreage of the site, <br /> 8O development, developmental coverage and contours before and <br /> 9� aft�r development indicated_ 1� intervals not to exce.ed .5 feet. <br /> � �Y1� �' A r� <br /> ����• .- <br /> 10 (2) [ndication of the peak discharge and volume of surface water <br /> 11 currently entering and leaving the subject property due t� the <br /> 12 design storm. <br /> 13 (3) Indication of the peak discharge ani amount of runoff which <br /> 14 will be generated within the subject property, due to the design <br /> 15 storm, if the development or proposed activity is allowed to prcceed. <br /> v <br /> •16 (4) [letermination of the pcak dischargc and amount of �!�ater that <br /> � ' <br /> � 1� H�ill be generated by the design storm at various points on the subjcct <br /> alg property. <br /> ��\ � 19 (b) Proposed measures for handling thr. computed runoff and insuring <br /> ( <br /> � � 20 �vater quality at the detai! level specified in the procedures A7anual. <br /> i <br /> ��� Zl (c) Proposed measures for controlling runoff, maintaining water quality <br /> � <br /> % 22 and controlling erosion during construction. <br /> 24 (2) The requirements of this section may be modified at the discretion <br /> i <br /> ! 24 of the City C•ngineer in special cases requiri�g more or less information. <br /> � ZS Section 5: tvfandatory Requirements for Drzina e imprcvements <br /> � . <br /> i 2G (1) �a) Suriace water entering the subject nroperty shall be received <br /> � at the naturally occurring location and ;urface water exiung the <br /> 27 subject property shall be'dischar�ed at the naturai tocation with <br /> ' adequate energy dissipators within the subject property to <br /> � 28 minimize downstream dama�c and with no diversion at any of <br /> � thesc points; and . <br /> 29 <br /> � (b) The peak discharQe from the subject property due to the design <br /> ( 30 storm may not be increased beyond the level specified in the <br /> Comprehensive Drainage Plan due to the proposed development; <br /> 31 and <br /> : � <br /> � ! 32 <br /> I : <br /> i � -6- <br /> I � <br /> � . <br />