Laserfiche WebLink
The Knebel Company, Inc. <br /> 9122 169th Avenue Northeast <br /> Granite Falls, WA 98252 <br /> � (360) 691-5910 <br /> February 2l, 2002 <br /> Pete Cooper <br /> City of Everett <br /> 3101 Cedar Street <br /> Everett, Washin�non 98201 <br /> RE: Inspection proposal for the Scottish Rite Temple building located at 2935 Oakes <br /> Avenue, Everett, WA, <br /> Dear Mc Cooper, <br /> The Knebel Company submits the following cost proposal for an inspection of suspect <br /> asbestos contnining building materials, lead in paint, and PCB light ballast affecting the <br /> demolition of the building located at 2935 Oakes Avenue, Everett, WA. <br /> This cost proposal includes sample extraction, sample analysis, and report generation. <br /> The report submitted will include sample results, a description of each material sampled, <br /> the location of each sample taken, an assessment of asbestos containing materials, <br /> quantity of nsbestos containing materinl, and the lab and inspector accreditation. <br /> Asbestos Sample analysis (regular) 25 samples @ 530.00 per samp(e $750.00 <br /> Asbestos Sample analysis (rush) 23 samples @ $40.00 per sample $920.00 <br /> Lead paint sample analysis(regular) 7 samples a 530.00 per sample $210.00 <br /> Lead paint sample analysis(rush) 5 samples @ 5a0.00 per sample $200.00 <br /> Sample Collection und ivalkrhrough) 23 /hour rCi $6�.00 /hour $1,495.00 <br /> TCLP for lead 0 sample Q 5100.00 per sample $0.00 <br /> Report Generation 2l hours @ $50.00 /hour 51,050.00 <br /> TOTAL $4,625.00 <br /> No Lead TCLP sampling will be performed during this inspection per a :'irective &om <br /> the Ciry of Everett. <br /> Please call me with questions or comments. (360)691-5910 <br /> Sincerely, <br /> J ' <br /> Sara Knebel <br /> (President) <br /> i <br />