Laserfiche WebLink
OBi09i00 15:1A Q425 821 JIB1 TRIAD ASSOCIATES �OOY <br /> TRIAD ASSOCIAT�S M E E T I N G M I N U T E S <br /> Date: JuAs 8, 2000 <br /> Those Present: �shk�k(CGL� Derren Johr�ison(TMloey),�Da1 H�III (Triad) <br /> prepared By: Don Hill � <br /> RE: Oakos Commona <br /> Triad Job No.: ��7 <br /> Copies To: Mich�d WishkosM, Kirk Brooks, Alon Locke,flle � <br /> Purpose of sitc mee.king (9am on Monday 6/5/00) waa to review dunents for maltin8 traneitioa <br /> tYom back of HC stalls to allay 9ow line less sevore. Solution elemeuts ag�'eed uPon bY all <br /> pazties included: <br /> . Move west lim+t of southerty FIC sisll to the west to inatch stair well to inaeaee slope len}�th <br /> &om the bacic of the southeriy HC stall s u the alley 9ow line <br /> • Stert slope to alley 8ow line at the back cdge of the southerly FiC stall <br /> . la the vicinity of th� NC stalls, wurp tl�e slley flow line from north w south (flow direction) <br /> from 12' from the aticy cast cdge (standard section) to the east try appro�dmatel,y 5' to 8' sa <br /> that the Qow ��ne is approxitnalely 6' to 4' &om thc alley east edge (juet behind the stalls) <br /> and then back to the standard secdon south of the HC stells <br /> . Raise SSMH 2 *im (currenily installed Nut covered by tea�porary graveUg�ading)by as much <br /> as 8" using appropriate adjuRunent l�rade rin�s as a part of completis�g the aRey �gading <br /> (grading south of SSMH 2 6es yet to be completed) <br /> . Kirk Brrio�ks en�d(by ldepbaee on Tk�da3' Q✓6✓09) th��t�Ghi+g M tir CSty <br /> of Ev�rlt aeM�er ►ndntenance jwr� (Don HnLson), oddi►es aa nwck � 8" o.� <br /> odf restment g►iodt rings is aete�table xidtoat bav�wa tn►�s¢1J�e�ARlude cati <br /> . Adjust S3MH 1 rim similar to above as a part uCcompleting the alley grading <br /> • Separate from above, restore allry pavemtnt north of the site as a result of acwedstorm <br /> inslaDation by testoring portions of cut asphalt (atation 1+0f) to appro�rimate stalion 1+50) <br /> with new asphnit rcpair per Ciry stendard and bY Testoring portions of affected gravel <br /> (approximate station 1+50 to stadon 2+24[north propeity line]) with campacted gravel to <br /> match ptevious as discussed in t1►e projoct pro-cunsWction confenena <br /> Michacl`�shkos�to forward these meetinB minutes to Darren Johnsoa <br /> Kirk Brooks to foiward tl�ese mating minutes to Alan Locke. <br /> pleuse provide any clarifications of the.9e meetin8 mmutes immediatdy. <br />