Laserfiche WebLink
June ADDRESS LV5b8 n1esU ve.-221 <br />specific commitment conditions (applicable when checked) <br />tote: All required repairs must be complete in a professional manner. <br />All certifications and/or pest control certificates of completion must be submitted before <br />requesting final inspection of repairs. Fote: If VC-15 is required, it is reconunended <br />this certificate be obtained before anv other certifications are obtained and any repair <br />'C-11 D If property is sold under Section 221(d)(2) a certificate of compliance with the <br />minimum housing code will be required prior to request for inspection of other addendum <br />requirements. If there are no addendum requirements, the certificate may be submitted <br />with closing documents. <br />IC-12 ® Submit certification from the local authority having ;jurisdiction that the subject <br />property is in compliance with the [,ocn'L Minimum flonninf; Codo. <br />IC-13 0 Submit certification from a state licensed pest control operator that wood destroying <br />organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, have <br />been eliminated. Attach list of any repairs or corrections completed in connection <br />with above certification. A "Standard Notice of' WorL Completed" or a report form <br />indicating no infestation may be submitted as certification. Note: All repairs must <br />be completed in a professional manner and in compliance with local building codes. <br />JC-14 0 0 (a) This commitment is subject to receipt of clear certificate(s) for (electrical, <br />plumbing, roofing, and heating). The required certificate(s) is (are) being ordered <br />and will be paid for by IND. Cost of aduitional certificates or required repairs shall <br />be borne by the Seller. <br />O (b) Reinspection to examine the following system(s) not in operation at the time <br />of our appraisal is required. Please notify the Valuation Branch of this office in <br />writing when ready for inspection: <br />0 plumbing 0 heating O electrical <br />Correction of any deficiencies found is a specific condition of this commitment. <br />Indicated system(s) shall be operable and inspection completed prior to the request <br />for conversion to a firm commitment. <br />VC-15 0 Furnish evidence from the local health authority indicating approval of I;he <br />0 individual water supply system, Z:7 individual sewa;e disposal system. <br />It is recommended the above evidence of' anuroval be obtained before commencing any <br />VC-16 ® ® (a) Re -roof '? dwelling and/or Q garage with minimum 235# self sealing composition <br />shingles or #1 cedar shingles, and repair sheathing and install new flashings as necessary, <br />Remove all old roofing when two or more layers exist. <br />(b) Repair roof of L7 dwelling and/or L% garage to an acceptable condition. <br />(c) Re -roof built-up roof: After removing all old roofing, install. min. 3 ply -hot <br />mo <br />7fed 15# felt roof with flood coat and 400// gravel per 100 sq. ft. <br />(d) Repair built-up roof: Remove all gravel and counter flashing from roof, clean <br />surface to accept hot mop. Provide minimum 15 lb. felt, hot mopped and flood coated. <br />Replace gravel and flashing and properly seal all gutters and apertures. <br />VC-17 ® Paint all exterior metal and wood trim of 0 house and/or L% garage after adequately <br />preparing surface. Tn roams with openable windows, at least one must be froze and operable <br />VC-18 L7 Paint entire exterior of L7 house and/or L7 garage including trim. Prepare surface <br />by repairing all damaged and deteriorated areas, remove all loose paint and blisters and <br />apply an undercoat to all bare wood. Tn rooms with openable windows, at least one must <br />be free and operable. <br />VC-19 ® Remove the existing floor covering in the following rooms: <br />bathroom <br />Replace with new resilient floor covering over suitable underlayment after making <br />necessary repairs to subfloor. <br />VC-20 U Submit statement from purchaser acknowledging wall-to-wall carpet as the finished floor <br />u <br />in the O kitchen bathroom. <br />VC-42 (1) Install new 40 gallon gas or electric hot water heater with 3/411 <br />non-adjustable temperature & pressure relief valve with discharge <br />line to outside or interi'i9ouldrain. Lensed otlidpmont not nnvoopl:nhln. <br />IMA 10111111 In1'1 11 111 (11"V, 11 1 'IliI <br />