Laserfiche WebLink
CIASED CM WORK ORDERS REPORT <br />City o£ Everett Total Vtility Maintenance Management System <br />02/28/1994 Page 1 <br />�.�������«������«��o���.«����������ua������������:.�����e��Qa����. <br />Date Rnnge :02/O1/1992 - 02/24/1994 <br />CM Work Order Range :<81nnk> - 8405421080229 Pattern :7101196750055 <br />Itam Ranga :<Blank> - WW2202o001 Pattern :• <br />Proqrau ALL Function ALL Activity ALL <br />�.��.s������.�s:��ss�����aaa��a�ae���ea��=:s:se_a��s�:sa��a� <br />IX NORR ORDER ID: 7101196750055 Title: RENEl4 5/8" 5923 OAKES AVE <br />ItaID ID: -- <br />Locetion ID: -- <br />Proqram 710 Funetion 119 Activity 5i5 <br />Date Completed: 02/O1/1994 <br />Ov�rall Craft: <br />I��ued: O1/06/1994 Issued by: GJ Assigned to: <br />Out of Sarvice? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reeding: <br />uowntime: 0 hours <br />Status: <br />Neterials: <br />ID Descziption Date A Used <br />ADAP�4000�47 <br />AD71P34000347 <br />ADAP» 000547 <br />BOX000065517 <br />COUP3l00�6{7 <br />SLI.O�{1011�7 <br />ELI.03�104217 <br />MSTE76089l47 <br />N/A <br />N/1� <br />PIPEIl060647 <br />PIPE74060647 <br />VALV3{008348 <br />NIRE00119847 <br />HDAPTER 3/4" CST X INSTA-TZTE@ <br />ADAPTER �/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER CONC W/STEEL LID <br />COUPLING 3/4" ANG MET X FIP @ <br />ELL 3/4" 90 DEG BW\SS ' <br />ELL 3/�^ STREET BRASS � <br />METER 5/8^ • NO REMOTE READER <br />METER RUBBERS (FROM STOCK) <br />COPPER RINGS (FROM STOCR) <br />PIPE 7/4" POLY I.P.S. <br />PIPE 7/4" POLY I.P.S. <br />V11LVE METER 3/4" LOCK WING ZP@ <br />TRACING WIRE 30 GAUGE <br />pork Dascription: <br />lI11IN CONS^.'RUCTION W/O� 710-119-673-0720 <br />l(ETER 1 11141 <br />Total coat for vork order 7101196750055: <br />O1/04/1994 <br />01/19/1994 <br />O1/04/199< <br />O1/0</1994 <br />O1/04/1994 <br />O1/04/199< <br />O1/04/1994 <br />O1/04/1994 <br />O1/19/1994 <br />O1/19/1994 <br />01/04/1994 <br />O1/19/1994 <br />O1/04/1994 <br />01/19/1994 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />4 <br />1 <br />4 <br />Total Material Cost: <br />Cost <br />16.06 <br />16.06 <br />16.12 <br />33.37 <br />7.�1 <br />1.67 <br />1.98 <br />29.6Q� <br />0.00 � <br />0.00� <br />`0.52 <br />1.04 <br />8.01 <br />0.28 <br />_'_-___'__ <br />128.02 <br />128.02 <br />