Laserfiche WebLink
DateJe�.�-� <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Public works Permit <br />Bldg Dept. <br />Public Works Fee S <br />Total Fee <br />Less Appt Fee Paid $ <br />Balance Due <br />c R-u i '.%c�5/7 r1LjfUkt �lf/�yP�P.flj- t%PZC3 �C,�.PS <br />Ulj Zip Phone <br />Ot. per Mading Addre.,_ <br />Phone <br />Mailing <br />Describe ProFosed Work 1) (_�— Q <br />Project Address (if known) LfRI7 DC^ H, <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Centerline of street <br />• Property Lines <br />• Outline and dimensions of all existing and • Indicate North <br />Show any proposed grading changes <br />proposed structures on the lot • Show measurements M <br />• Existing and proposed utilities W <br />DO NOT WRITE BELOW THIS LINE O <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.881 O. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424-555 <br />O <br />a <br />Approved for Construction <br />Date <br />FINAL INSPECTION Date <br />Approved as Constructer) <br />W <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />EverEverett, WA 98201 <br />Phone, 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs. <br />expenses. or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public properly damaged thereby. <br />to <br />Signature of Applicant <br />IN <br />180 DAYS AUTHORIZEDWORK PERMIT By THIS BSTARTED <br />OF DATEPERMIT ISISSUED ANDTHEREAFTER ISTO <br />BE DILIGENTLY PURSUED TO COMPLETION, THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />