Laserfiche WebLink
i <br />�.s. . <br />`�,,. <br />,:r . : <br />:�;, ' <br />V . .. <br />.,. <br />,: � <br />_;,' . <br />' Total UtilityEMai�ntenanceRMan�agementTSystem ���i�N�j OCT 0 6 1997 <br />11/06/1996 Page 1 <br />-------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------- <br />Date Range :O1/09/1989 - 11/05/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196648963 <br />Item Ranqe :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196648963 Title: <br />G<DIIPLICAiE PRIN'iING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 <br />Date Completed: 10/07/1996 <br />Overall Craft: <br />Issued: 05/05/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST WDT <br />Naterials: <br />ID <br />I1Dd,P34000547 <br />SOX000056247 <br />CORP34001847 <br />ELL034104247 <br />MRTE36089447 <br />N/�, <br />PIPE34060647 <br />SADD46018247 <br />SETT34033647 <br />Vehicles: <br />ID <br />V2117 <br />VH0003 <br />Name <br />SO .75 INCH 4939 OCEAN AVE <br />Activity 664 <br />Issued by: WMW Assigned to: WDT <br />Priority: Travel Time: 0.00 Hr. <br />CAVANAH, SH.�.?IE G. <br />WALDEN, DAROLD T. <br />Description <br />AD?,PTER 3/4° MIP X INST?.-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />rORP STOP 3/4^ CCT X INST?, @ <br />ELL 3/4^ 90 DEG STREFT BRASS ^ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TR?,CING WIRE <br />PIPE 3/4^ POLY I.P.S. <br />SEkVICE SADDLE 8" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />91 CHEV i-TON HYD UNIT <br />94 CAT BACKHOE <br />Work Description: <br />----------------- <br />METER N41908809 <br />Planned Hrs Actual Hrs <br />0.00 6.00 <br />0.00 6.00 <br />Total Labor. Cost: <br />Cost <br />78.42 <br />122.70 <br />201.12 <br />Date M Used Cost <br />10/07/1996 1 8.14 <br />10/07/1996 1 12.90 <br />10/07/1996 1 15.10 <br />10/07/1996 1 1.76 <br />10/07/19 30.67 <br />10/07/1996 25 _ 2.7 <br />10/07/1996 25 6.00 <br />10/07/1996 1 14.29 <br />10/07/1996 1 52.73 <br />Total Material Cost: 144.34 <br />1.7� <br />Hours cost I� I ,59 <br />Total Vehicle Cost: 201.00 <br />