Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard =601. <br />04�� <br />Connect side sewer per City Standard ='s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side hewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout in'iltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />C FM4 Install erosion control measures as determined by the Public Works inspector. such as silt <br />fence, straw bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for small parcels <br />1 <br />Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />44, All xcavated material from foundation, sidewalk and driveways shall be hauled to an <br />ap roved, permitted site. No wasting of material is allowed on this building lot. <br />u6 <br />1 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan is 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard =307. <br />8N7-'Pave driveway from the front property line out to the street paving. <br />18. Contact the <br />water and sewer services. <br />Water District for connecting provisions for this building's <br />19. A catch basin as per City Standard Plan =402 with a gas trap per Standard Plan =410 is <br />required for the parking area. <br />20. If a sewer pump system Is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />ct ?�. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />icfc9�.Sr{d11 cln:,le,-�9 T/ I <br />PWComments I Z <br />