Laserfiche WebLink
i <br />'s <br />CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System pa e 1 <br />06/21/1994 g <br />as sssaasa�¢casss-eaxs�e-a�-eesecc��e-�a=eco===e-=cc--ecvcveecc=aevocaee�as <br />Date Range :06/O1/1992 - 06/21/1994 <br />C!I WOL'k Order Ranqe :<Blank> - 8405421080229 Pattern :7401196750895 <br />IteID Range :<Blank> - WW22o20001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />as�Q��ss�s=a�:�aeac¢sav�acsvvvamvve-vvasssaneaacvsavc-a�saacvassv===v=a=aa=aa <br />CM WORK ORDER ID: 7401196750695 Title: REPAIR 4106 OLIVE ST <br />«DUPLICATB PRINTING OF THIS WORK ORDER» <br />Item ID: WS3195E005 -- WATER SERVICE <br />Locatirn ID: " <br />Proqraa� 740 Function 119 Activity 675 <br />Data Completed: 06/13/1994 <br />Ovarall Craft: <br />Issued: 06/13/1994 <br />Out of Service? NO <br />Meter Readinq: <br />Downtima: 0 hours <br />Status: <br />�; Labor: <br />� CL'd!t ID <br />� WST MKC <br />' JL SRJ <br />Matarials: <br />ID <br />1►DJ1P34000547 <br />BOX000056Z47 <br />COUP34004647 <br />ELL074101447 <br />8LT.034104247 <br />PIPE3406Q647 <br />SETT9409�647 <br />V�hicles: <br />ID <br />V2117 <br />Issued by: SKL Assiqned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />MOORE, KIM C. <br />STBNSETE[, ROBERT J. <br />Planned Hrs Actual Hrs <br />----------- -------- <br />0.00 3.00 <br />0.00 3.00 <br />Description <br />------------------------------ <br />AD1►PTER 3/4° MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" 1►tiG MET X FIP @ <br />ELL 3/4° 90 DEG BRASS _ <br />ELI� 3/4" STREET SR11SS <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" LGTH15" <br />Dascription <br />CHEV 1 TON '91 <br />' Work Description: <br />----------------------------------------- <br />R11ISE SHUT OFF TO NEW GRADE. <br />Total cost for work order 7401196750895: <br />Total Labor Cost: <br />Date <br />06J14/1994 <br />06/14/1994 <br />06/14/1994 <br />06/14/1994 <br />Q6/14/1994 <br />06/14/1994 <br />06/14/1994 <br />� used <br />4 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />Total Material Cost: <br />Date Hours <br />06/13/1994 3 00 <br />Total Vehicle Cost: <br />� <br />cost <br />Y 59.19 <br />44.10 <br />103.29 <br />Cost <br />32.00 <br />12.53 <br />4.27 <br />1.29 <br />1.69 <br />1.00 <br />-----47_78 <br />100.56 <br />Cost <br />17 40 <br />17.40 <br />221.25 <br />