Laserfiche WebLink
�.. <br />J�'� � ►\� $ �1,6� �GGE��� � �� �~ <br />,���' W� �''�"��� -��.s <br />-� ,� �',K �,�-'�Ft� � {�%� / <br />�,���, � �� <br />�� L�� � <br />June 9, 1987 � l5 V� D 1'' � D <br />KEN BRUESTLE, BRIDGE ENGINEER <br />BURLINGTON NORTIIEF2N RAILWAY <br />2000 FIRST INTERSTATE CENTER <br />999 THIRD AVEMIE <br />SERTTLE, WA 98104-1105 <br />RE: HOWARTH PARK BRIDGE (:ONSTRUCTION <br />Dear Mr. Bruestle: <br />JUN 1 '. 1987 <br />CITY OF EVERETT <br />Public Works Dept. <br />everett <br />the Evergreen <br />an or <br />everett <br />V�RK$ �HD ACCRE�iION <br />DE�ARiMCM - fOAC51 P�Rr. <br />:ss o�x <br />SC�N iTOG�N•..U�O <br />MuiiqG �DDAE55 <br />JDO) WETMOAC <br />[vEacn w.yapo+ <br />The City of Everett Parks and Rerreation DeparEment is currently restoring <br />Fbwarth Park, which involves placing a pedestrian bridge over Burlington <br />Nnrthern right-of-way. We have worked closely with Mr. CTuck Lundgren, Public <br />Works Engineer, who has copies of our plans, specifications and pertinent <br />correspondence should you care to review them. <br />At a May 4 pre-construction meeting with Mr. Parker Adelman, Division <br />Engineer, we were advised that the Project Contractor (JIJ Construction) must <br />arrange to have yourself or your designated represer.tative available to <br />conduct an inspection during bridoe installation: We eriticipate that bridge <br />installation will take place during the last week o£ June or firct week of <br />July. <br />We will provide �8 hours edvance notice per the "Special Railroad <br />Provisions"., We have asked JIJ Construction to contact you directly and <br />provide you with the schedule of construction activity. Please contact me at <br />once if you foresee any scheduling problems. 7hank you. <br />S'ncerely, <br />Theo Mittet, Park Coordinator <br />Everett Parks snd Recreation Department <br />245d/co <br />JIJ Construction Contacts: <br />Knut Olberg, Project Manager <br />Job Site Number: 258-2466 <br />Office Number: 366-5050 <br />cc: Bob Cooper, Director, Parks and Recreation <br />Jim Shiel�s, Assistant Park Director <br />�I� City Plan Inspector <br />blberg, JIJ Construction <br />Bob Garner, Lee Jofmson Consultants <br />����uvr�� <br />JUN 15 �� <br />EVERETT BUILDIN6 DEPT. <br />